
Resources
Search for Resources:
Filter
Choose Resource Type
Select Product Categories
Select Product Families
Search for Resources:
Choose Resource Type:
Select Product Categories
Select Product Families
Search By Keyword:
38 Results
Case Study
G&W Electric’s Custom “Monk Parakeet” Viper-ST Crossarm Design
CHALLENGE: As one of the few temperate-zone parrots, the monk parakeet is more able than most to survive cold climates partly because they build communal nests around heat-producing electrical equipment…
Read Case Study Case Study
The World’s First High Voltage Recloser by G&W Electric Brings Automation and Enhanced Reliability to Northeast Utility
When a utility serving more than 3.5 million customers across multiple service areas, was tasked with meeting company goals to improve power reliability and upgrade outdated equipment on their transmission…
Read Case Study Case Study
Wind Farm Fault Protection Saves Upgrading Equipment Costs
CHALLENGE: A new wind farm was being constructed in the Central Midwest. The design was for 240 wind turbines with the goal of 400 MW of total capacity. The project…
Read Case Study Case Study
Investor Owned Utility Retrofits with CLiP
CHALLENGE: An Investor-Owned Utility (IOU) was faced with a large number of older downtown networks and was concerned about arc flash and the risk of potentially hazardous failure of network…
Read Case Study Case Study
Accusense Voltage Sensor Retrofit on Viper-ST
CHALLENGE: The Utility implemented Volt-Var Optimization (VVO) and Conservation Voltage Reduction (CVR) programs that require real-time, metering class voltage sensing with 0.5% accuracy or better. These programs are designed to…
Read Case Study Case Study
AEP Texas Automatic Source Transfer for Medical Plant
CHALLENGE: AEP in San Angelo, TX faced challenges when supplying critical power to an industrial plant that produces medical supplies in a sterile environment and operates 24 hours a day,…
Read Case Study