How CLiP® Current Limiting Protector Helped the City of Lodi Meet Growing Energy Demands
When a new 48-MW power plant threatened to push fault current beyond system limits, Lodi Electric Utility needed a solution that would protect equipment without reducing generation capacity or delaying the project.
Ready to discuss now? Request a consultation.
Read the case study to learn:
How Lodi addressed a critical fault current challenge
As much-needed generation was added to the grid, the additional fault current risked exceeding the rating of existing distribution equipment.
Why traditional protection approaches fell short
Solutions such as current-limiting fuses and reactors presented challenges, including rating limitations, power losses or reduced capacity.
What outcomes Lodi achieved with current limiting protection
Discover how the utility was able to move forward while avoiding costly, time-consuming project delays and gaining key benefits.
