Every project starts with a problem the catalog can’t solve. See how utilities and commercial & industrial operators worked with our engineers to define the challenge, build the solution, and measure what changed on the grid.

Filter:

Filter by Industries

Industry

39 results

Case Study

Industrial Manufacturing Feeder Restoration

CHALLENGE:A major Midwest manufacturer of raw material used in making LCD chips needed to expand their manufacturing operation to accommodate a substantial increase in business. They already had two plants that were filled to…

Case Study

Airport Feeder Restoration

CHALLENGE:Power for a large southern California airport is served by feeders from two different utility substations. Normally half of the load is carried by each feeder. When power from one feeder is lost, crews…

Case Study

Military Base Closed Loop Restoration

CHALLENGE:The government of South Korea required more land for commercial and industrial growth. The preferred location selected for expansion however was occupied by a major U.S. military base. An agreement was reached between the…

Case Study

Utilities

Underground Cable Transition Project

CHALLENGE:Continuous expansion of a major downtown city necessitated an upgrade of the electrical service by the utility company. The utility was faced with replacing the old substation equipment with new switchgear and associated apparatus.…

Case Study

Utilities

Three Phase Protection for Confined Space Applications

CHALLENGE:The utility serves approximately 95,000 residential and 13,000 commercial/industrial customers. Thedistribution system is 70% overhead and 30% underground. Nominal system voltage is 12.47kV transformed from a 34.5kV sub-transmission system. A new substation was required…

Case Study

Utilities

Fault Protection for Three Phase Motors

CHALLENGE:The oil extraction process requires large, three phase motors to operate the pumping wells. To protect these motors and other equipment, the customer used three phase reclosers programmed for four shots to lockout. The…

Case Study

Utilities

Alternative Solution to Air Insulated Substations

CHALLENGE:The utility serves approximately 95,000 residential and 13,000 commercial/industrial customers. The distribution system is 70% overhead and 30% underground. Nominal system voltage is 12.47kV transformed from a 34.5kV sub-transmission system. A new substation was…

Case Study

Utilities

Low Profile Recloser Solves Cluttered Pole Clearance Issue

CHALLENGE:The utility faced an extensive replacement project for many of their old, oil-filled reclosers. Many installation sites where replacement was necessary incorporated very congested utility poles where maintaining clearances was an issue. The utility…

Case Study

Utilities

Recloser Replaces Substation Breaker

CHALLENGE:The utility provides service to approximately 10,000customers in a primarily rural service territory of approximately 2,000 square miles. The utility needed to replace their aging circuit breakers, but wanted to leave the rack mounted…

We start with the diagnosis, not the datasheet

Engineered to order means the specification comes from the site — footprint constraints, flood exposure, the automation platform already in service, the crews who will maintain it. Our application engineers work the problem with your team before anything is built.

These case studies are the record of that work: what was constraining the network, what was engineered in response, and what the utility measured afterward.

Engineered to order. Built to last.

Engineered for your grid, not off the shelf

Working through a footprint constraint, a submersibility requirement, or an SF6 transition of your own? Start with an application engineer, not a catalog.