Case Study
Utilities
Commercial Scalable Fault Isolation
CHALLENGE:A southern utility was interested in improving service reliability by installing an underground fault detection, isolation, and restoration scheme for a circuit feeding several important residential/commercial customers. They needed a solution that could be…

Case Study
Utilities
Non-Communicating Automatic Loop Restoration
CHALLENGE:A major midwest utility was experiencing a substantial number of outages on a ½ mile section of overhead feeder that runs through a heavily wooded forest preserve. Several large commercialcustomers located on either side…

Case Study
Utilities
Load Interrupter Switchgear Replacement
CHALLENGE:A prominent Southern California university had an extensive underground distribution system that was originally built in the 1960s. Loadbreak switching and overcurrent protection were performed using airinsulated, metal enclosed, Load Interrupter, or “LI” switches.…

Case Study
Utilities
Overhead Automatic Transfer with Overcurrent Protection
CHALLENGE:The vast majority of electrical service interruptions are on overhead circuits. Exposure to the elements, wildlife, and tree branches are all too common reasons why utilities implement solutions such as reclosers and automatic transfer…

Case Study
Utilities
Investor Owned Utility Retrofits with CLiP
CHALLENGE:An Investor-Owned Utility (IOU) was faced with a large number of older downtown networks and was concerned about arc flash and the risk of potentially hazardous failure of network transformers. As with the traditional…
We start with the diagnosis, not the datasheet
Engineered to order means the specification comes from the site — footprint constraints, flood exposure, the automation platform already in service, the crews who will maintain it. Our application engineers work the problem with your team before anything is built.
These case studies are the record of that work: what was constraining the network, what was engineered in response, and what the utility measured afterward.
Engineered to order. Built to last.
Engineered for your grid, not off the shelf
Working through a footprint constraint, a submersibility requirement, or an SF6 transition of your own? Start with an application engineer, not a catalog.